Location
The Hong Kong University of Science and Technology
Client
Paul Y. Construction & Engineering Company Limited
Construction Period
Aug 2020 – Dec 2021
Contract Sum
$109M
Scope
a) Carrying out all predrilling and drilling works for pipe piling and foundation
b) Construction of the full ELS system, including the design/ construction of hoarding, covered walkways, and temporary works
c) Installation and driving of Sheet Piling
d) Installation of Pipe Pile and Soldier Pipe walls, including shaft boring, pipe supply, placement, and grouting
e) Construction of Structural Steel Shoring and Strutting
f) Installation of permanent Tie Backs and Soil Nails, including drilling, bar installation, grouting, and load testing