ND/2018/02

The Establishment of an Agricultural Park in Kwu Tung South
Completed Projects

Location

Kwu Tung South

Client

Civil Engineering and Development Department

Construction Period

Oct 2020 – Oct 2022

Contract Sum

$120M

Scope

a) formation works for about 7.5 hectares (ha) of land;
b) related infrastructures including drainage, sewerage, irrigation, water supply, utilities and street lighting;
c) associated park facilities including basic lodging and storage units; and
d) construction of about 900 meters (m) long access road and footpaths (including a culvert bridge of about 5m wide; and two vehicular bridges with associated footpaths of about 20m and 40m long respectively) connecting the existing Tsiu Keng Road.