MTR Q044763

Elevated Road along LOHAS Park Road and the Pedestrian Footbridge FB1
Completed Projects

Location

LOHAS Park Road

Client

Hsin Chong Construction Co. Ltd

Construction Period

Aug 2016 – Dec 2018

Contract Sum

$116M

Scope

a) Construction of cast-in-situ concrete piling works, pile caps, ground beams, and footings
b) Construction of the elevated road structure, including abutment, piers, and a prestressed deck, connecting LOHAS Park Road and LOHAS Park Podium
c) Supply and installation of bearings for the highway structures, and the prestressed concrete works
d) Carrying out excavation, any necessary shoring, and backfilling for the construction of foundations, pile caps, substructures, utilities, drainage, sewerage, and external works
e) Carrying out utilities and drainage works
f) Carrying out roadwork at LOHAS Park Road
g) Provision of fittings and finishes, signage, and building services installations for the elevated road
h) Provision of hard and soft landscaping and other external work elements at and underneath the elevated road
i) Carrying out street lighting works and tree felling and compensation works|
j) Coordinating the installation of bearings at the corbel of Site G and coordinating the installation of dowel bars, movement joint, and movement joint cover for the interface with the future estate road R8 (Site C1).