Location
Kau Lung Hang San Wai, Kau Lung Hang Lo Wai and Tai Hang
Client
Drainage Services Department
Construction Period
Jun 2012 – Jun 2016
Contract Sum
$178M
Scope
a) One sewage pumping station at Tai Hang
b) About 11km of sewers with diameters ranging from 150mm to 300mm at Kau Lung Hang San Wai, Kau Lung Hang Lo Wai, and Tai Hang
c) About 125m of twin rising mains in size of 200mm in Tai Hang
d) Remaining works in Nam Wa Po Trunk Sewage Pumping Station (PST3) including ground paving works, surface drainage, civil works in associated with the chemical dosing facilities and minor civil modification works.