Location
Sandy Ridge Cemetery
Client
Civil Engineering and Development Department
Construction Period
Dec 2017 – Dec 2020
Contract Sum
$780M
Scope
a) Formation of about 1.77 ha of platform and the associated geotechnical and slope stabilization works and earth retaining structures;
b) Upgrading of existing Sha Ling Road and the associated geotechnical and slope stabilization works and earth retaining structures;
c) Construction of Road D (EVA) as well as Road B and the associated infrastructural works;
d) Construction of sewerage, drainage, and water supply works along Sha Ling Road, Road D (EVA), Road B and the associated connection works;
e) Construction of a sewage detention tank complete with odour and septicity control mechanism;
f) Construction of noise barriers along Sha Ling Road;
g) Modification works at junction between Man Kam To Road and Sha Ling Road;
h) Construction of a new pick up / drop off point at Man Kam To Road;
i) Construction of a new Refuse Collection Point (RCP) near the junction between Man Kam To Road and Sha Ling Road;
j) Landscaping works (including both hard and soft landscape works); and
k) Associated street lighting, street furniture and road marking